This is part of the Wykamol EP40 Epoxy Floor Coating System consists of the EP40 Epoxy Primerand EP40 Epoxy Top Finish coat. This listing is for the Primer Coat Only so you may also need the Wykamol EP40 Finishing Top Coat (available in grey or clear).
EP40 Epoxy Floor Primer is designed to soak into the substrate, block pores, improve adhesion and ensure an even, high quality finish. After the final application of EP40 Epoxy Finish Coat, floors become easier to clean with a hard wearing, dust free, waterproof, impervious finish and are substantially more resistant to damage by chemicals, fuels and lubricants.
This Wykamol EP40 Epoxy Floor Coating System system is fantastic for repairing old damp concrete floors – often laid in the past with no damp proof membrane, instead of hacking up the old floor, relaying the concrete on a new DPM and waiting for it all to dry before covering the floor (which often takes months) you can repair the old floor and install a new surface with self leveller using grip grit to form a key. The savings (depending on the size of floor) can run into thousands of pounds and knock months off your schedules.
After applying the Wykamol EP40 Epoxy Floor Coating System, floors become easier to clean with a hard wearing, dust free, waterproof, impervious finish and are substantially more resistant to damage by chemicals, fuels and lubricants.
Special Features
Easy to apply
Excellent adhesion to concrete
Provides attractive, dust free finish
Substantially more resistance to chemicals, fuels and lubricants
Can be used internally and (externally if covered)
Ideal for areas with high foot traffic
Can be applied to green concrete after 7 days
Floor becomes easier to clean with impervious finish
Typical Uses
To be used on concrete floors in a variety of domestic, commercial and industrial environments, including:
Domestic concrete floor slabs
Industrial plants
Commercial and retail stores
Warehouses
Hospitals
Showrooms
Garages
Gymnasiums
Food preparation areas
Application
EP40 Epoxy Floor Primer:
Using a stiff brush or roller, work the product into the substrate, ensuring all areas are completely covered.
Allow to cure for at least 12 hours prior to applying a EP40 Epoxy Finish Coat. If atmospheric or substrate temperatures are below 20°C, allow for a longer initial curing time. Product should be just tack free.
Do not allow Primer to fully cure – do not allow curing time to exceed 26 hours before applying a 2nd coat of Primer or Finish Coat.